The filling of Derwent reservoir began in November 1914, and overflowed for the first time in January 1916, with the water almost immediately passing into supply. The dam can support a total of 9.64 million cubic metres of water. On the day I visited (Monday) a sign stated it is currently at 76% capacity.
Only two years after the dam's completion in 1916, it was decided that the flow from the reservoir was insufficient to support the surrounding population. As a result, between 1920 and 1931 the rivers Alport and Ashop were also diverted from the Ashop valley into the reservoir using tunnels and a Venturi flume.
The diversion helped hold back water during the construction of the Ladybower Reservoir to the south, which was constructed between 1935 and 1945.
During the Second World War, Derwent reservoir was used by pilots of the 617 Squadron for practising the low-level flights needed for Operation Chastise (commonly known as the "Dam Busters" raids), due to its similarity to the German dams.